| Green Line | |
|---|---|
| Overview | |
| Status | Proposed |
| Termini |
|
| Stations | 14 |
| Service | |
| Type | Rapid transit |
| System | Coimbatore Metro |
| Technical | |
| Number of tracks | 2 |
| Character | 14 km Elevated |
| Operating speed | 80 km/h (50 mph) |
The GreenLine or Line 4 is one of the two proposed lines of Coimbatore Metro, Phase 1 Project, the second being the Red line (Line 1). The line stretches from Coimbatore Junction to Valiyampalayam Pirivu. The line consists of 14 stations,[1][2].
Stations
The stations proposed in the first phase of Coimbatore Metro in the Line-4 are:[3]
| Green Line | ||||||||
|---|---|---|---|---|---|---|---|---|
| S.No | Station Name | Interchange connection | Places Connected | Layout | Opened | Depot Connection | Depot Layout | |
| English | Tamil | |||||||
| 1 | Coimbatore Junction | கோயம்புத்தூர் சந்திப்பு | Red Line, | Coimbatore Government Hospital | Elevated | Proposed Phase 1 | None | None |
| 2 | Ramnagar | ராம்நகர் | None | None | Elevated | Proposed Phase 1 | None | None |
| 3 | Gandhipuram Central Bus Terminus | காந்திபுரம் மத்திய பேருந்து நிலையம் | None | Elevated | Proposed Phase 1 | None | None | |
| 4 | Coimbatore Omni Bus Stand | கோயம்புத்தூர் ஆம்னி பேருந்து நிலையம் | None | Elevated | Proposed Phase 1 | None | None | |
| 5 | Moor Market | மூர் மார்க்கெட் | None | None | Elevated | Proposed Phase 1 | None | None |
| 6 | Ganapathy Pudur | கணபதி புதூர் | None | None | Elevated | Proposed Phase 1 | None | None |
| 7 | Athipalayam | அத்திபாளையம் | None | None | Elevated | Proposed Phase 1 | None | None |
| 8 | Ramakrishna Mills | ராமகிருஷ்ணா மில்ஸ் | None | Prozone Mall | Elevated | Proposed Phase 1 | None | None |
| 9 | Vinayagapuram | விநாயகபுரம் | None | None | Elevated | Proposed Phase 1 | None | None |
| 10 | Chithra Nagar | சித்ரா நகர் | None | None | Elevated | Proposed Phase 1 | None | None |
| 11 | Saravanampatti | சரவணம்பட்டி | None | None | Elevated | Proposed Phase 1 | None | None |
| 12 | Viswasapuram | விஸ்வாசபுரம் | None | None | Elevated | Proposed Phase 1 | None | None |
| 13 | VGP Nagar | விஜிபி நகர் | None | None | Elevated | Proposed Phase 1 | None | None |
| 14 | Valiyampalayam Pirivu | வலியம்பாளையம் பிரிவு | None | None | Elevated | Proposed Phase 1 | None | None |
See also
References
- ↑ "DPR for Coimbatore metro rail project to be submitted to Tamil Nadu government by July 15". The Hindu. 1 July 2023. Retrieved 1 July 2023.
- ↑ "CMRL Submits Detailed Project Reports for Madurai and Coimbatore Metro Projects". The Metro Rail News. 15 July 2023. Retrieved 15 July 2023.
- ↑ "39km Metro Line project in Phase 1". India Herald. 7 July 2023. Retrieved 7 July 2023.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.