| Enbridge Centre | |
|---|---|
![]() Enbridge Centre in 2018 | |
![]() Location in Edmonton | |
| Alternative names | Kelley Ramsey Tower |
| General information | |
| Status | Completed |
| Type | Office |
| Address | 10175 - 101 Street NW, Edmonton, Alberta, Canada |
| Coordinates | 53°32′33″N 113°29′36″W / 53.5424°N 113.4933°W |
| Construction started | 2013 |
| Completed | 2016 |
| Owner | John Day Developments; Pangman Development Corporation |
| Height | 110.6 m (363 ft) |
| Technical details | |
| Floor count | 26 |
| Floor area | 51,190 m2 (551,000 sq ft) |
| Lifts/elevators | 15 |
| Design and construction | |
| Architecture firm | DIALOG |
| Structural engineer | DIALOG |
| Main contractor | Ledcor Construction Limited |
| Other information | |
| Parking | 372 stalls |
| Website | |
| www | |
| References | |
| [1] | |
Enbridge Centre is a 28-storey office tower in Edmonton, Alberta. The facade of the building uses the bricks from the historic Kelly Ramsey Building, which previously occupied the site.[2] It is located on 101 St. NW, and is connected to the Pedway network.
References
- ↑ "Enbridge Centre". CTBUH Skyscraper Center. Retrieved July 16, 2020.
- ↑ Mah, Bill (13 October 2016). "New Enbridge Centre rises from ashes of historic Kelly Ramsey Building". Edmonton Journal. Retrieved 5 April 2018.
External links
Wikimedia Commons has media related to Enbridge Centre.
- Enbridge Centre Official Website
- "Enbridge Centre". CTBUH Skyscraper Center.
- "Enbridge Centre". Emporis. Archived from the original on July 17, 2020.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.


