Duta–Ulu Klang Expressway (DUKE, E33), is the main expressway network in Klang Valley, Malaysia. The 18 km (11 mi) expressway connects New Klang Valley Expressway's Jalan Duta Interchange (E1) to Taman Hillview Interchange on Kuala Lumpur Middle Ring Road 2 28 in Ulu Klang. The expressway was constructed to provide the "missing link" between New Klang Valley Expressway (E1), Kuala Lumpur–Karak Expressway (E8), and Kuala Lumpur Middle Ring Road 2 (JKR28). This expressway is also known as the Kuala Lumpur Northeast Dispersal Link Scheme. It was proposed by Tan Sri Datuk Lim Kang Hoo, a chairman of Ekovest Berhad.
It originally was given route code E16 but later changed to E33 instead. In addition to improving connectivity, DUKE disperses traffic from the city to the suburban range through several routes in and out of several branches of the main intersection. Through DUKE, drivers can move from one part to other parts of Kuala Lumpur in a short time, by bypassing congested traffic areas, such as Kuala Lumpur Middle Ring Road 1 and Kuala Lumpur Inner Ring Road.
Route background
Duta–Sentul Pasar–Ulu Klang sections
The Kilometre Zero of this section is located at Jalan Duta Interchange near Jalan Duta, Kuala Lumpur, at its interchange with the New Klang Valley Expressway  North–South Expressway Northern Route.
 North–South Expressway Northern Route.
Greenwood–Sentul Pasar sections
The Kilometre Zero of this section is located at Sentul Pasar Interchange. At Bandar Dalam Interchange the expressway overlaps with the Federal Route 2 from Bandar Dalam Interchange to Greenwood Interchange.
History
The expressway used to be known as the Kuala Lumpur North East Expressway (KLNEE). It is a main element in the Kuala Lumpur Structure Plan 2020 as specified in the Transportation Research of the Japan International Cooperation Agency (JICA) conducted by the Kuala Lumpur City Hall (Dewan Bandaraya Kuala Lumpur) (DBKL) in 1985. It was identified by DBKL as one of the main connecting routes to complete the Kuala Lumpur Structure Plan 2020. DBKL conducted a detailed study of the alignment that feed the next three years, including Environmental Impact Assessment and Public Opinion. These studies and reports were approved by the Concession Agreement signed with the Federal Government on 12 August 2004.
The construction of this expressway commenced in late 2005. The Jalan Duta–DUKE Interchange was built at the sharp hairpin of the NKVE and the Jalan Kuching Interchange was built at the former Jalan Kuching Toll Plaza owned by Kamunting Corporation Berhad. The expressway was partially (2/3) opened officially by the Minister of Works Ir Mohd Zin Mohamed on 9 January 2009. Three months later, the NKVE section was open to traffic on 30 April 2009. Built to accommodate 120,000 vehicles per day, this expressway will offer an attractive alternative route to Klang Valley residents, especially for those traveling from east to west and for those who want to go to the city centre.
Progress
Construction progress gallery
 Progress photo taken at Duta Interchange Feb 2006 Progress photo taken at Duta Interchange Feb 2006
 Progress photo taken at Duta Interchange Feb 2007 Progress photo taken at Duta Interchange Feb 2007
Developments
DUKE Extension Expressway Project
The phase two development of the DUKE will be built by Ekovest Bhd and will start in two weeks at a construction cost of RM1.183 billion. Phase two, which will entail the construction of an elevated highway that will complement the existing DUKE, was to be completed in 2015. The DUKE extension will comprise two additional links, namely the Sri Damansara Link and the Tun Razak Link. Both links are proposed to have dual carriageways and the Tun Razak link will be about 9 kilometres in length while the Sri Damansara Link will be 7 kilometres long. The expressway will serve as a link between the Kuala Lumpur Middle Ring Road 1 (MRR1) and Kuala Lumpur Middle Ring Road 2 MRR2.
Features
- Flyovers passing Segambut, Sentul and Setapak town.
- Sentul flyover sections with 132kv of Tenaga Nasional Berhad's (TNB) transmmision line (National Grid). During construction on 2007, the Cabinet directed the concessionaire Konsortium Lebuhraya Utara-Timur (KL) Sdn Bhd to share the TNB reserve in order to reduced land acquisition costs. In order to do this, the existing high tension pylons were replaced with monopoles, with the expressway running either side.
Tolls
The DUKE uses an open toll system.
Batu, Sentul Pasar, Ayer Panas, Segambut & Batu Tambahan toll plazas have fully Electronic Toll Collections (ETC). As part of an initiative to facilitate faster transaction at the Batu, Sentul Pasar, Ayer Panas, Segambut & Batu Tambahan Toll Plazas, all toll transactions at four toll plazas on the DUKE are conducted electronically via Touch 'n Go cards, SmartTAGs or RFID tags starting January 2018.
Toll rates
(Starting 23 November 2017)
| Class | Type of vehicles | Rate (in Malaysian Ringgit (RM)) | 
|---|---|---|
| 0 | Motorcycles, bicycles or vehicles with 2 or less wheels | Free | 
| 1 | Vehicles with 2 axles and 3 or 4 wheels excluding taxis | RM 2.50 | 
| 2 | Vehicles with 2 axles and 5 or 6 wheels excluding buses | RM 3.80 | 
| 3 | Vehicles with 3 or more axles | RM 5.00 | 
| 4 | Taxis | RM 1.30 | 
| 5 | Buses | RM 1.30 | 
- Note: Toll charges can only be paid with the Touch 'n Go cards, SmartTAGs or RFID tags. Cash payment is not accepted.
List of interchanges
Phase 1
Duta–Sentul Pasar–Ulu Klang sections (Main Link)
| Km | Exit | Interchange | To | Remarks | |
|---|---|---|---|---|---|
| West   North–South Expressway Northern Route  AH141 New Klang Valley Expressway Klang Kota Damansara Shah Alam  North–South Expressway Central Link Kuala Lumpur International Airport (KLIA) .jpg.webp)   North–South Expressway Southern Route  AH2 Johor Bahru   North–South Expressway Northern Route  AH2 NSE Northern Route Ipoh Taiping Penang Alor Setar | |||||
|   North–South Expressway Northern Route  AH141 New Klang Valley Expressway PLUS Expressway border limit | |||||
|  Duta–Ulu Klang Expressway Duta–Ulu Klang Expressway Start/End of expressway (Touch 'n Go, MyRFID and SmartTAG ETC only) Kesturi border limit | |||||
|  Duta–Ulu Klang Expressway 0 | 3301 | Jalan Duta Interchange |  North–South Expressway Northern Route New Klang Valley Expressway South Jalan Tuanku Abdul Halim (Jalan Duta) City Centre From  North–South Expressway Northern Route NKVE West Only Southwest  Sprint Expressway, Penchala Link Mont Kiara Sri Hartamas Petaling Jaya  Damansara–Shah Alam Elevated Expressway - Puncak Alam, Meru, Subang Airport, Kota Damansara From Persiaran Dutamas (proposal)[1] | Trumpet expressway interchange | |
|  Duta–Ulu Klang Expressway 0 | 3301 | Jalan Duta Interchange | Direction Towards  Sprint Expressway Sprint Expressway From East Southwest  Sprint Expressway Penchala Link Mont Kiara Sri Hartamas Petaling Jaya  Damansara–Shah Alam Elevated Expressway Kota Damansara | From east only | |
| Segambut flyover | Start/End of flyover | ||||
| Segambut flyover Road-Railway crossing stacked bridge | |||||
| 3301A 3301B | Segambut flyover Sungai Keroh bridge Segambut Interchange | Upper Flyover 3301A Northwest  Duta–Ulu Klang Expressway DUKE Extension Expressway Segambut Bandar Menjalara Kepong  FT 54 Sungai Buloh Highway Kuala Selangor   Damansara–Puchong Expressway Damansara–Puchong Expressway Desa Park City Damansara Below Flyover Only 3301B East Segambut Bypass Jalan Segambut Jalan Sultan Azlan Shah Jalan Ipoh Jalan Sentul | Directional T elevated expressway interchange Ramp out to/from expressway | ||
| Segambut flyover | Start/End of flyover | ||||
|  Duta–Ulu Klang Expressway 3 | |||||
| 3302 | Jalan Kuching Interchange |  FT 1 Kuala Lumpur–Rawang Highway North Ipoh Rawang Kepong Fraser's Hill South City Centre Cheras  North–South Expressway Southern RouteSeremban | Semi cloverleaf interchange | ||
| Batu Tambahan toll plaza BTU (East bound to Bamboo Hills) MyRFID MyRFID Touch 'n Go Touch 'n Go SmartTAG SmartTAG Opened toll system Pay toll (Accepts electronic toll payment (Touch 'n Go, MyRFID and SmartTAG) only) | |||||
| Jalan Ipoh Ramp | Bamboo Hills @ KL Digital City North Batu Kentonmen Army Camp | Exit/Entrance ramp via toll plaza | |||
|  Batu toll plaza BTU |      TnG TAG .jpg.webp) Customer Service Centre | West bound | |||
| Batu toll plaza BTU (West bound) MyRFID MyRFID Touch 'n Go Touch 'n Go SmartTAG SmartTAG Opened toll system Pay toll (Accepts electronic toll payment (Touch 'n Go, MyRFID and SmartTAG) only) | |||||
|  Duta–Ulu Klang Expressway 4 | |||||
| Sentul flyover | Start/End of separated flyover | ||||
| Sentul flyover Sungai Batu bridge | |||||
| Sentul flyover 132 kv of TNB transmission line (National Grid) 500m | High voltage transmission line on the flyover | ||||
| Sentul flyover 132 kv of TNB transmission line (National Grid) 500m Railway crossing bridge | High voltage transmission line on the flyover | ||||
| Sentul flyover | Start/End of separated flyover | ||||
| Sentul flyover Jalan Sentul Ramp | Jalan Sentul (No Entry) | Ramp in from expressway | |||
| Sentul flyover | Start/End of flyover | ||||
|  Duta–Ulu Klang Expressway 5 | |||||
|   Duta–Ulu Klang Expressway  AH141 Duta–Ulu Klang Expressway | |||||
| 3303 | Sentul Pasar Interchange | North  Duta–Ulu Klang Expressway  FT 2  AH141 Greenwood–Sentul Pasar Link (Karak Link) Gombak Sentul Taman Greenwood  FT 28 Kuala Lumpur Middle Ring Road 2 Batu Caves Kepong Selayang   East Coast Expressway  FT 2  AH141 Kuala Lumpur-Karak Highway Genting Highlands Kuantan Kuala Terengganu  Duta–Ulu Klang Expressway Tun Razak Link KLCC City Centre Kampung Baru   North–South Expressway Southern Route Seremban | Y expressway interchange Elevated u-turn interchange | ||
|   Duta–Ulu Klang Expressway Duta–Ulu Klang Expressway | |||||
| Setapak flyover | Start/End of flyover | ||||
| Setapak flyover Sungai Gombak bridge | |||||
| Setapak flyover Jalan Pahang Ramp |  FT 2 Genting Klang–Pahang Highway Jalan Pahang (No Entry) | Ramp in to expressway | |||
| Setapak flyover | Start/End of flyover | ||||
| Ayer Panas toll plaza APS (East bound) MyRFID SmartTAG SmartTAG Touch 'n Go Touch 'n Go Opened toll system Pay toll (Accepts electronic toll payment (Touch 'n Go, MyRFID and SmartTAG) only) | |||||
|  Ayer Panas toll plaza APS Kesturi main headquarters |      TnG TAG .jpg.webp) Customer Service Centre Kesturi operation office | East bound | |||
| Ayer Jernih–Semarak flyover | Start/End of flyover | ||||
| 3304 | Ayer Jernih–Semarak flyover Ayer Jernih Ramp | Setapak City Centre | Ramp in/out to/from expressway | ||
| Ayer Jernih–Semarak flyover | |||||
| 3305 | Ayer Jernih–Semarak flyover Semarak Interchange | Jalan Sultan Yahya Petra (Jalan Semarak) South City Centre Kampung Baru PULAPOL | Half diamond interchange | ||
| Ayer Jernih–Semarak flyover | Start/End of flyover | ||||
| 3306 3306B 3306C | Setiawangsa Interchange | Jalan Jelatek North Wangsa Maju Taman Sri Rampai Danau Kota South Setiawangsa  B31 Jalan Ampang 3306B   Setiawangsa–Pantai Expressway South Kampung Pandan Bandar Malaysia 3306C North  Setiawangsa–Pantai Expressway - Taman Melati, Genting Kelang  FT 28 Kepong | 3-tier stacked interchange | ||
| Federal Territory of Kuala Lumpur | |||||
| FT Kuala Lumpur–Selangor border | |||||
| Selangor Darul Ehsan Gombak district border | |||||
| Hilview flyover | Start/End of flyover | ||||
| 3307 | Hilview flyover Jalan 37/66 Ramp | Jalan 37/66 North Taman Melawati South Jalan Enggang Taman Setiawangsa Taman Keramat | Roundabout interchange | ||
| Hilview flyover Sungai Klang bridge | |||||
|   Duta–Ulu Klang Expressway Duta–Ulu Klang Expressway Start/End of expressway (Touch 'n Go,MyRFID and SmartTAG ETC only) Kesturi border limit | |||||
|  FT 28 Kuala Lumpur Middle Ring Road 2 JKR border limit | |||||
| 3308A 3308B | Hilview flyover Taman Hillview Interchange |  FT 28 Kuala Lumpur Middle Ring Road 2 3308A North Ulu Klang Taman Melawati Taman Melati Taman Permata   East Klang Valley Expressway East Klang Valley Expressway (EKVE) (Not yet opened) Hulu Langat Bandar Mahkota Cheras Kajang   East Coast Expressway  FT 2  AH141 Kuala Lumpur-Karak Highway Genting Highlands Kuantan 3308B South Ampang Pandan Indah Cheras Sungai Besi   Shah Alam Expressway Puchong   Shah Alam Expressway Shah Alam   Sungai Besi–Ulu Klang Elevated Expressway Sungai Besi-Ulu Klang Elevated Expressway (SUKE) Ampang Hulu Langat Cheras   North–South Expressway Southern Route  AH2 NSE Southern Route Seremban Malacca Johor Bahru Kuala Lumpur International Airport .jpg.webp) | Stacked expressway interchange | ||
Greenwood–Sentul Pasar sections (Karak Link)
| Km | Exit | Interchange | To | Remarks | |
|---|---|---|---|---|---|
|  Duta–Ulu Klang Expressway 0 (K) | 3303A | Sentul Pasar Interchange |  Duta–Ulu Klang Expressway Duta–Sentul Pasar–Ulu Klang Link (Main Link) West   North–South Expressway Northern Route  AH2 Ipoh  Sprint Expressway Petaling Jaya  FT 1 Segambut  FT 54 Kepong  FT 1 Sentul  FT 1 Kuala Lumpur city centre East Jalan Sultan Yahya Petra (Jalan Semarak)  Duta–Ulu Klang Expressway Setiawangsa  FT 28 Ulu Klang  FT 28 Ampang South (U-Turn Only)  Duta–Ulu Klang Expressway DUKE Extension Expressway  Duta–Ulu Klang Expressway Seremban  Duta–Ulu Klang Expressway KLCC  Duta–Ulu Klang Expressway City Centre  Duta–Ulu Klang Expressway Bulatan Pahang  Duta–Ulu Klang Expressway Sentul | Y expressway interchange Elevated u-turn interchange | |
| Sentul toll plaza STL (North bound) MyRFID SmartTAG SmartTAG Touch 'n Go Touch 'n Go Opened toll system Pay toll (Accepts electronic toll payment (Touch 'n Go, MyRFID and SmartTAG) only) | |||||
|  Sentul toll plaza STL |      TnG TAG .jpg.webp) Customer Service Centre | North bound | |||
| 3303B | Sentul Pasar Interchange | East Only DUKE Extension Expressway  FT 2  FT 68 Jalan Gombak Gombak Setapak | From exit only | ||
| Sungai Chubadak bridge | |||||
|  Duta–Ulu Klang Expressway 1 (K)  FT 2 -- | |||||
|   Duta–Ulu Klang Expressway  AH141 | |||||
| 3309 | Jalan Kampung Bandar Dalam |  FT 2 Jalan Kampung Bandar Dalam West Sentul Batu East Gombak Setapak | Diamond interchange | ||
|   Duta–Ulu Klang Expressway  FT 2  AH141 Duta–Ulu Klang Expressway | |||||
|  Duta–Ulu Klang Expressway 2 (K)  FT 2 -- | |||||
|  Duta–Ulu Klang Expressway 3 (K)  FT 2 -- | |||||
| Sungai Padang Balang bridge | |||||
| Federal Territory of Kuala Lumpur | |||||
| FT Kuala Lumpur–Selangor border | |||||
| Selangor Darul Ehsan Gombak district border | |||||
|   Duta–Ulu Klang Expressway  FT 2  AH141 Duta–Ulu Klang Expressway Start/End of expressway (Touch 'n Go, MyRFID and SmartTAG ETC only) Kesturi border limit | |||||
|  FT 2  FT 28  AH141 Kuala Lumpur Middle Ring Road 2 JKR border limit | |||||
|  Duta–Ulu Klang Expressway 4 (K)  FT 2 -- | |||||
| 3310 | Greenwood Interchange | West  FT 28 Kuala Lumpur Middle Ring Road 2 Batu Caves Kepong Rawang  FT 54 Sungai Buloh  FT 54 Kuala Selangor   Damansara–Puchong Expressway Damansara-Puchong Expressway (LDP) Damansara Petaling Jaya Puchong East  B22 Jalan Batu Caves  FT 68 Gombak  B22 Taman Greenwood | Directional ramp Stacked diamond interchange | ||
|  FT 28  AH141 Kuala Lumpur Middle Ring Road 2 Ampang Taman Melati Ulu Klang Northeast   East Coast Expressway  FT 2  AH141 Kuala Lumpur-Karak Highway Kuantan Genting Highlands | |||||
DUKE Extension Expressway
| 
 Duta–Ulu Klang Expressway | |
|---|---|
| DUKE Extension Expressway | |
| Length | 9 km (5.6 mi) | 
| Existed | 2015–present | 
| History | Completed in 2017 | 
The DUKE Extension Expressway (E33) is an expressway in Kuala Lumpur, Malaysia connecting Sentul Pasar Interchange on the Duta-Ulu Klang Expressway to the Genting Klang–Pahang Highway.
History
The phase two development of the DUKE will be built by Ekovest Bhd and will start in two weeks at a construction cost of RM1.183 billion. Phase two, which will entail the construction of an elevated highway that will complement the existing DUKE, was to be completed in 2015. The DUKE extension will comprise two additional links, namely the Sri Damansara Link and the Tun Razak Link. Both links are proposed to have dual carriageways and the Tun Razak link will be about 9 kilometres in length while the Sri Damansara Link will be 7 kilometres long. The expressway will serve as a link between the Kuala Lumpur Middle Ring Road 1 (MRR1) and Kuala Lumpur Middle Ring Road 2 MRR2. This 9 kilometre and 7 kilometre segment was opened to traffic on 28 September 2017 and 23 October 2017.
Tolls
The DUKE Extension Expressway uses an open toll system.
Sentul Pasar & Segambut toll plazas have fully Electronic Toll Collections (ETC). As part of an initiative to facilitate faster transaction at the Sentul Pasar & Segambut Toll Plazas, all toll transactions at two toll plazas on the DUKE are conducted electronically via Touch 'n Go cards, SmartTAGs or RFID tags starting January 2018.
(Starting 23 November 2017)
| Class | Type of vehicles | Rate (in Malaysian Ringgit (RM)) | 
|---|---|---|
| 0 | Motorcycles, bicycles or vehicles with 2 or less wheels | Free | 
| 1 | Vehicles with 2 axles and 3 or 4 wheels excluding taxis | RM 2.50 | 
| 2 | Vehicles with 2 axles and 5 or 6 wheels excluding buses | RM 3.80 | 
| 3 | Vehicles with 3 or more axles | RM 5.00 | 
| 4 | Taxis | RM 1.30 | 
| 5 | Buses | RM 1.30 | 
- Note: Toll charges can only be paid with the Touch 'n Go cards, SmartTAGs or RFID tags. Cash payment is not accepted.
List of interchanges
Phase 2
Sri Damansara Link
| Km | Exit | Interchange | To | Remarks | |
|---|---|---|---|---|---|
| 3320 | Segambut Interchange |  Duta–Ulu Klang Expressway Duta–Sentul Pasar–Ulu Klang Link (Main Link) East  FT 28 Gombak  FT 28 Batu Caves  East Coast Expressway  FT 2  AH141 Kuantan  East Coast Expressway  FT 2  AH141 Genting Highlands  Duta–Ulu Klang Expressway Seremban  Duta–Ulu Klang Expressway KLCC  Duta–Ulu Klang Expressway City Centre  Duta–Ulu Klang Expressway Bulatan Pahang  Duta–Ulu Klang Expressway Sentul  FT 215 Jalan Semarak  Duta–Ulu Klang Expressway Setiawangsa  FT 28 Ulu Klang  FT 28 Ampang West (U-Turn)  North–South Expressway Northern Route  AH2 Ipoh  Sprint Expressway Petaling Jaya  FT 1Kuala Lumpur–Rawang Highway North Only/U-Turn  FT 1 Rawang  FT 1 Bandar Baru Selayang | Directional T with elevated u-turn expressway interchange | ||
|  Duta–Ulu Klang Expressway 0 (K) | |||||
| 3321 | Plaza Tol Segambut Exit | Jalan Lang Emas Jalan Segambut Segambut town centre Taman Sri Bintang Taman Sri Sinar | Interchange with toll plaza | ||
| Segambut toll plaza SGT (Both bound) MyRFID Touch 'n Go Touch 'n Go Touch 'n Go SmartTAG Opened toll system Pay toll (Accepts electronic toll payment (Touch 'n Go MyRFID SmartTAG) only) | |||||
|  Segambut toll plaza SGT Kesturi main headquarters |      TnG TAG .jpg.webp) Customer Service Centre Kesturi operation office | Both bound | |||
|  Duta–Ulu Klang Expressway 1 (K) | |||||
|  Duta–Ulu Klang Expressway 2 (K) | |||||
| 3322 | Jalan Burung Hantu Ramp | Jalan Burung Hantu Kepong Baru Kepong Taman Bukit Maluri Bandar Menjalara Desa Park City | Ramp in/out from expressway | ||
|   Duta–Ulu Klang Expressway Duta–Ulu Klang Expressway Start/End of expressway (Touch 'n Go, MyRFID and SmartTAG ETC only) Kesturi border limit | |||||
|  FT 28  FT 54 Kuala Lumpur Middle Ring Road 2 JKR border limit | |||||
|  Duta–Ulu Klang Expressway  FT 28  FT 54 3 (K) | |||||
| 3323A | Menjalara Interchange |  FT 28  FT 54 Kuala Lumpur Middle Ring Road 2 South Persiaran Utama Bandar Sri Damansara Kepong Industrial Area   Damansara–Puchong Expressway Damansara–Puchong Expressway Desa Park City Damansara Petaling Jaya Puchong Putrajaya | From directional ramp expressway interchange | ||
| 3323B | Menjalara Interchange |  FT 28  FT 54 Kuala Lumpur Middle Ring Road 2 North (U-Turn)  FT 28  FT 54 Kepong  FT 28 Selayang  FT 1 Rawang  FT 28 Batu Caves   East Coast Expressway  FT 2  AH141 Kuantan   East Coast Expressway  FT 2  AH141 Genting Highlands West  FT 54 Sungai Buloh Highway Bandar Sri Damansara Sungai Buloh Kuala Selangor Puncak Alam   North–South Expressway Southern Route  AH2 North–South Expressway Northern Route  North–South Expressway Southern Route  AH2 Ipoh  North–South Expressway Southern Route  AH2 Klang  North–South Expressway Southern Route  AH2 Kuala Lumpur International Airport (KLIA) .jpg.webp)  North–South Expressway Southern Route  AH2 Johor Bahru | Elevated directional ramp expressway interchange with u-turn from  FT 28  FT 54 Kuala Lumpur Middle Ring Road 2 &   Duta–Ulu Klang Expressway Duta–Ulu Klang Expressway | ||
Sentul Pasar–Jalan Gombak Link
| Km | Exit | Interchange | To | Remarks | |
|---|---|---|---|---|---|
| 3303 | Sentul Pasar Interchange |  Duta–Ulu Klang Expressway Duta–Sentul Pasar–Ulu Klang Link (Main Link) West (U-Turn)   North–South Expressway Northern Route  AH2 Ipoh  Sprint Expressway Petaling Jaya  FT 1 Segambut  FT 54 Kepong  FT 1 Sentul  FT 1 Kuala Lumpur city centre East Jalan Sultan Yahya Petra (Jalan Semarak)  Duta–Ulu Klang Expressway Setiawangsa  FT 28 Ulu Klang  FT 28 Ampang | Y elevated expressway interchange with u-turn to  Duta–Ulu Klang Expressway Duta–Sentul Pasar–Ulu Klang Link (Main Link) | ||
|  Duta–Ulu Klang Expressway 0 (K) | |||||
| Sungai Gombak bridge | |||||
|   Duta–Ulu Klang Expressway Duta–Ulu Klang Expressway Start/End of expressway (Touch 'n Go, MyRFID and SmartTAG ETC only) Kesturi border limit | |||||
|  FT 2  FT 68 Jalan Gombak | |||||
|  Duta–Ulu Klang Expressway 1 (K) | |||||
| 3351 | Jalan Gombak Interchange |  FT 2  FT 68 Jalan Gombak North Bentong Genting Highlands  FT 2 Sentul  FT 2 Batu Caves   East Coast Expressway  FT 2  AH141 Kuantan Gombak Wisma Ekovest South  FT 2 Genting Klang–Pahang Highway Setapak town centre Jalan Genting Klang  FT 28 Klang Gates  FT 28 Ulu Klang Jalan Pahang Sentul City Centre Seremban Petaling Jaya | Tunnel trumpet interchange | ||
Tun Razak Link
| Km | Exit | Interchange | To | Remarks | |
|---|---|---|---|---|---|
| North  Duta–Ulu Klang Expressway  FT 2  AH141 Greenwood–Sentul Pasar Link (Karak Link)  FT 28 Batu Caves  FT 28  FT 2  AH141 Gombak   East Coast Expressway  FT 2  AH141 Kuantan   East Coast Expressway  FT 2  AH141 Genting Highlands | |||||
| Sentul Tambahan toll plaza STL (South bound) MyRFID Touch 'n Go SmartTAG Touch 'n Go Opened toll system Pay toll (Accepts electronic toll payment (Touch 'n Go, MyRFID and SmartTAG) only) | |||||
|  Sentul toll plaza STL |      TnG TAG .jpg.webp) Customer Service Centre | South bound | |||
|  Duta–Ulu Klang Expressway 0 (K) | 3305A 3305B | Sentul Pasar Interchange |  Duta–Ulu Klang Expressway  AH141 Duta–Sentul Pasar–Ulu Klang Link (Main Link) West   North–South Expressway Northern Route  AH2 Ipoh  Sprint Expressway Petaling Jaya  FT 1 Segambut  FT 54 Kepong  FT 1 Sentul  FT 1 Kuala Lumpur city centre  Duta–Ulu Klang Expressway  FT 2  AH141 Greenwood–Sentul Pasar Link (Karak Link) North (U-Turn)  FT 28 Batu Caves  FT 28  FT 2  AH141 Gombak   East Coast Expressway  FT 2  AH141 Kuantan   East Coast Expressway  FT 2  AH141 Genting Highlands | Y expressway interchange Directional ramp elevated u-turn interchange | |
| -- | Jalan Gombak Link Ramp |  Duta–Ulu Klang ExpresswayJalan Gombak Link East  FT 2  FT 68 Jalan Gombak Gombak Jalan Genting Klang Klang Gates Jalan Pahang Setapak | Southbound direction only | ||
|  Duta–Ulu Klang Expressway 1 (K) | |||||
| Sungai Gombak bridge | |||||
| 3305C | Bandar Baru Sentul Ramp |  FT 2 Genting Klang–Pahang Highway North Jalan 9/48A Jalan Sentul Sentul town centre Bandar Baru Sentul Jalan Pahang  FT 2 Setapak  FT 68  FT 2 Gombak | Ramp out from expressway | ||
|  Duta–Ulu Klang Expressway 2 (K) | |||||
|  Duta–Ulu Klang Expressway 3 (K) | |||||
|  Duta–Ulu Klang Expressway Duta–Ulu Klang Expressway Start/End of expressway (Touch 'n Go, MyRFID and SmartTAG ETC only) Kesturi border limit | |||||
| Jalan Tun Razak (Jalan Pekeliling) | |||||
| 3355A 3355B | Jalan Pahang Interchange |  FT 2 Genting Klang–Pahang Highway Jalan Pahang North  FT 2 Setapak  FT 68 Gombak   East Coast Expressway  FT 2  AH141 Kuantan South Jalan Tuanku Abdul Rahman (Batu Road) Jalan Chow Kit (Chow Kit Road) City Centre Hospital Kuala Lumpur .jpg.webp) Kuala Lumpur Middle Ring Road 1 Jalan Tun Razak West Ipoh Petaling Jaya East KLCC Ampang   North–South Expressway Southern Route  AH2 Seremban   North–South Expressway Southern Route  AH2 Melaka   North–South Expressway Southern Route  AH2 Johor Bahru | Roundabout interchange with one directional underpass to Ipoh and Petaling Jaya | ||
See also
References
- ↑ B, Kathy (5 April 2019). "KL Metropolis poised to set new bar | New Straits Times". NST Online. Retrieved 6 October 2021.

