| Overview | |
|---|---|
| Service type | Garib Rath Express |
| Locale | Jharkhand, Orissa |
| First service | 24 July 2017 |
| Current operator(s) | East Coast Railway |
| Route | |
| Termini | Bhubaneswar (BBS) Dhanbad (DHN) |
| Stops | 10 |
| Distance travelled | 776 km (482 mi) |
| Average journey time | 15h |
| Service frequency | Tri-weekly [lower-alpha 1] |
| Train number(s) | 12832/12831 |
| On-board services | |
| Class(es) | AC 3 Tier Economy |
| Seating arrangements | Yes |
| Sleeping arrangements | Yes |
| Auto-rack arrangements | Yes |
| Catering facilities | Yes |
| Observation facilities | Large windows |
| Technical | |
| Rolling stock | 01 |
| Track gauge | 1,676 mm (5 ft 6 in) |
| Operating speed | 51 km/h (32 mph) (average with halts) |
| Rake maintenance | Bhubaneswar |
The Bhubaneswar - Dhanbad Garib Rath Express is a Garib Rath train belonging to the East Coast Railway zone that runs between and Bhubaneswar and Dhanbad in India. It is currently being operated with 12832/12831 train numbers on a tri-weekly basis. In 2017, after the closure of Dhanbad–Chandrapura line, the train was short terminated/originated from Bokaro Steel City railway station. After opening of Dhanbad–Chandrapura line in 2019, it was again extended upto Dhanbad.
Due to COVID-19 pandemic, the train was cancelled and not yet restored. Instead a tri-weekly special train was introduced with train number 02832/02831 in August 2022 which is running on the route with same time table. Later on the train was made to run daily.
Service
The 12832 Bhubaneswar - Dhanbad Garib Rath Express has an average speed of 52 km/h and covers 776 km in 15 h. The 12831 Dhanbad - Bhubaneswar Garib Rath Express has an average speed of 49 Km/h and covers 779 km in 16 h.
Route and halts
The important halts of the train are:
Coach composite
The train has standard ICF rakes with max speed of 110 km/h. The train consists of 12 coaches.
Traction
One train comprising 12 wagons is hauled by a Visakhapatnam electric loco shed based WAP-7 electric locomotive end to end.
Notes
- ↑ Runs three days in a week for every direction.